15 January 2019

A bright star among galaxy of incompetency and inefficiency.

Viewing around us the chaotic and pathetic conditions of garbage all over, roads full of pot holes, streetlight which either do not work or remain on 24 hours a day. Less said about the traffic violations.jumping of red lights etc better it is. No wonder along with me lot of people are critical of concerned officials.
For a change I would like to praise one of the officials of NMC. He is Mr Rajput. He is the gentleman I contact in case of street light enforceability. I do not know his designation or his position in the Municipal hierarchy. It has been my experience for last few years that whenever I have reported faulty streetlights they have been attended within in just a COUPLE OF HOURS. This, considering the sate of municipal apparatus, it is efficiency personified.
Hats off  to Mr Rajput. Keep up the good work Sir.
Citizens of Nagpur definitely deserve many more officials like him. incompetency and inefficiency.
PM Velankar

13 January 2019

METRO NEWS..

Progress report.
Segmenting of LASSSSSSTTTT span on Hingna "T" Junction and Sitlamata crossing. 
12 January 2019.

12 January 2019.

13January 2019.

Good going,

12 January 2019

Great response from Metro Rail.

METRO NEWS.
On 08 January 2019 I had highlighted a potential fatal accident spot in the form of an obstruction left behind by the Metro Rail. 
I had also copy pasted FB post to Mr Akhilesh Halve, PRO, Metro Rail. 
See Photo Below. 
An obstruction. With potential to cause a fata accident. 8/1/19

I could not go on my morning walk for next 2-3 days . This morning during the morning walk I found that the obstruction has been removed . The road is now without this dangerous obstacle.
See photo below.
 
The obstruction removed. 12/1/19.

 I am sure that AKhiles must have played an important part in its removal. Thank you Akhilesh.
Thank you माझी मेट्रो for prompt action. You may have saved couple of precious human lives.

09 January 2019

A matter worth investigating.

After concreting of the Ring Road from Hingna T point. Street light Poles of modern designs were installed.
These were fitted with latest LED light fixtures which must have cost a lot of taxpayers money. One does not mind such expenditure as it is done for the benefit of the general public.
However one does mind when tax payers money is spent and commensurate benefit do nor accrue to public. Every streetlight pole is supposed to have two led light fixtures. Just 500 odd meters length of ring road has about 10 odd light fixtures missing. They were NEVER INSTALLED. If this is the case in 500 odd meters of road length one can only imagine total numbers of lights which were NOT installed but WERE PAID for.
It would be interesting to know who carried out final inspection and cleared the bills for settlement.
See the photos